Date |
Description |
| |
|
| |
Restore the studio
| |
Demo (ceilings, walls, wiring) |
| |
Restore front windows |
| |
Replace side window with superwide |
| |
Replace entry door |
| |
Install attic vents |
| |
Install skylights |
| |
Create space for wall mounted air conditioner |
| |
Wire for electricity |
| |
Insulate |
| |
Restore doors |
| |
Finish ceiling with exposed beams |
| |
Drywall |
| |
Build storage places |
| |
Drywall |
| |
Trim |
| |
Paint |
| |
Install wall mounted air conditioner |
| |
Move in and enjoy |
|
| |
Apply thin urethane foam board to the cinder block wall on the inside. |
| |
Paint the cinder block wall with sealing paint. |
| |
Install phone and coaxial cable jacks. |
| |
Seal the gaps to the upstairs at the top of the front and rear walls. The heat escapes up there. |
| |
Re-Install garage door trim pieces and clean the garage doors. |
| |
Install and caulk the side door trim. |
| Partial |
Repair sheathing and reinstall siding. |
| Half done |
Install garage door openers. Left side and right side. |
| |
Free up and repair windows |
| Scheduled for summertime |
Paint the garage floor. |